These might include the size of bolts or rivets, type of steel, weld symbols and sizes, structural steel paint system designation and finish coat color, notes concerning Notch Toughness, Fracture Control Plan, and welding inspection testing symbol requirements. Live Traffic Camera Note in the transmittal memo if there are none. Has milling or removing surface pavement, which will cause a difference in grade that will affect the utilities, drainage and/or traffic been taken into account? reason. Further instructions on the various types of items are included in the respective BDC on Pay Items. Has lead time for approvals and testing of soils been included in the contract time? Email: [email protected], About DelDOT Has the item, Clearing Site for Structures been established for removal of structures other than bridges? The user is on notice that neither the State The relationship between the metric and U.S. customary values is neither an exact (soft) conversion nor a completely rationalized (hard) conversion. Roadway Plan Development -Read Full Dislaimer. Bridge Design Specifications Design Manual, Part 4 Structures (DM-4) (Pub. 5. Instead, the notation should read (10 spaces @ 6' 2" = 61' 8"). Small scale diagram showing concrete placing sequence for continuous spans. E-11 LIGHTING STANDARD CONCRETE BASE. Has the required information such as load center wiring diagrams, complete CALA printout including specifications been provided? This information is used by the Review Engineer and Designer to determine if adverse geometrics precludes the use of machine finishing of the bridge deck. NJTA disclaims all responsibility for any copies, modifications, and reproductions of this website and the information it contains that are not produced by NJTA. Standard Details BDC Announcements Other than as may be required by law, NJTA does not plan to issue any updates or revisions to any such forward-looking statements if or when its expectations are realized or not realized, or when the events, conditions or circumstances on which such statements are based occur and, even if issued, any such updates or revisions may not be included on the Investor Page. The purpose of these actions is to ensure that environmental commitments and other sensitive environmental or land use issues which could affect the design, right of way or construction of a project are properly tracked and included into construction plans so that they may be ultimately implemented by the Resident Engineer/contractor. Estimated Pile Tip Elevation State Regulations Please choose an Exit that is of your point of entry. * Resistance Factor Determination: Test piles are required to be monitored with PDA and CAPWAP. 2018 Roadway Standard Drawings - Index of Sheets. Estimated quantities of structural steel and shear connectors. Do the electrical plans conform to Sections 11 and 12 of the NJDOT Design Manual - Roadway, the Sample Plans and the Standard Electrical Details? Does the information in the typical sections, tie and grade sheets and the construction plan sheets agree with the Design Exception? These Standard Drawings are for use only on NMDOT Projects. 2021 2020 2018 Toll Free: (800) 652 5600 Quality. Have proper title blocks been provided on the jurisdiction map and are they complete? Help Center Has the designer properly incorporated the geotechnical design and recommendations given in the Geotechnical Foundation Engineering Report, the Geotechnical Roadway Engineering Report and/or Rock Engineering Report into the plans and specifications? Have SHPO, hazardous and 4(f) concerns been addressed? Has existing and proposed curve data been shown on the plans? Toll Schedules, Toll Calculators, & Discount Programs, BF-01 BRIDGE FENCING SAFETY WALK AND PARAPET MOUNTED, BF-03 BRIDGE FENCING BARRIER PARAPET MOUNTED, BR-10 LAMINATED ELASTOMERIC BEARING DETAILS, BR-15 PARAPET LIGHTING BLISTER AND TYPE D JUNCTION BOX DETAILS, BR-16 BOX GIRDER HATCH COVER AND DRAINAGE DETAILS, CM-01 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, GENERAL TRUSS AND SIGN LAYOUT, CM-02 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, PLAN AND ELEVATION - MAINLINE STRUCTURE, CM-03 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, PLAN AND ELEVATION - RAMP STRUCTURE, CM-04 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, TRUSS AND FIELD SPLICE DETAILS, CM-05 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, TRUSS AND FENCE DETAILS, CM-06 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, DOOR DETAILS, CM-07 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, END FRAME DETAILS, CM-08 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, ACCESS LADDER AND PLATFORM DETAILS, CM-09 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, CABLE ROUTING AND HCMS MOUNTING DETAILS, CM-10 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BILL OF MATERIALS, CM-11 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BRACKET DETAILS - 1, CM-12 OVERHEAD SPAN HCMS SUPPORT STRUCTURES, BRACKET DETAILS - 2, CU-02 CONCRETE SIDEWALK AND CURB RAMP DETAILS, CU-03 LIP CURB AND CONCRETE CURB TRANSITIONS FOR GUIDE RAIL, CU-04 LIP CURB AND INLET TREATMENT AT BRIDGE STRUCTURES, DR-04 ALTERATIONS OF MANHOLES, INLETS AND MISCELLANEOUS DETAILS, DR-05 CONCRETE GUTTER AND SLOPE DRAIN DETAILS, DR-09 BLEEDER DRAINS, UNDERDRAINS AND SUBBASE OUTLET DRAIN, E-04 TYPE H POLE-TOP LUMINAIRE MOUNTING ASSEMBLIES, E-05 TYPE V POLE-TOP LUMINAIRE MOUNTING ASSEMBLIES, E-06 HIGHMAST LIGHTING STANDARD DETAILS - 1, E-07 HIGHMAST LIGHTING STANDARD DETAILS - 2, E-09 TRANSFORMER BASE AND POLE GROUNDING DETAILS, E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS, E-18 ROADWAY LIGHTING INSTALLATION DETAILS - 1, E-19 ROADWAY LIGHTING INSTALLATION DETAILS - 2, E-20 ROADWAY LIGHTING INSTALLATION DETAILS - 3, FE-01 CHAIN LINK FENCE AND FARM FENCE DETAILS - 1, FE-02 CHAIN LINK FENCE AND FARM FENCE DETAILS - 2, FX-01 FOUNDATION EXCAVATION AND POROUS FILL - 1, FX-02 FOUNDATION EXCAVATION AND POROUS FILL - 2, GR-06 ANCHORAGE AND TERMINAL GRADING AND ROADSIDE RECOVERY AREA, GR-09 BERM SURFACING AND GUIDE RAIL DELINEATOR, GR-10 BEAM GUIDE RAIL AND POST TREATMENTS, GR-18 THRIE BEAM TRANSITION SECTIONS AND ATTACHMENTS, ITS-01 ITSS GENERAL NOTES, LEGEND AND ABBREVIATIONS - 1, ITS-02 ITSS GENERAL NOTES, LEGEND AND ABBREVIATIONS - 2, ITS-09 ITS EQUIPMENT PLATFORM TYPE 1 DETAILS, ITS-10 ITS EQUIPMENT PLATFORM TYPE 2 DETAILS - 1, ITS-11 ITS EQUIPMENT PLATFORM TYPE 2 DETAILS - 2, ITS-12 ITS EQUIPMENT PLATFORM TYPE 3 DETAILS - 1, ITS-13 PLATFORM MOUNTED ITS EQUIPMENT PROTECTION DETAIL, ITS-14 ITS EQUIPMENT PLATFORM TYPE 4 DETAILS - 1, ITS-15 ITS EQUIPMENT PLATFORM TYPE 4 DETAILS - 2, ITS-24 TRAFFIC DETECTION STATION DETAILS - 1, ITS-25 TRAFFIC DETECTION STATION DETAILS - 2, ITS-29 DUCT BANK AND JUNCTION BOX TYPE PS DETAILS, ITS-31 ITS COMMUNICATIONS DIAGRAMS - ANALOG, ITS-31A ITS COMMUNICATIONS DIAGRAMS - DIGITAL, ITS-32 CCTV CAMERA - 40FT POLE INSTALLATION DETAILS, ITS-33 CCTV CAMERA, POLE MOUNTED WITH LOWERING DEVICE DETAILS - 1, ITS-34 CCTV CAMERA, POLE MOUNTED WITH LOWERING DEVICE DETAILS - 2, ITS-37 HCMS GENERAL NOTES, LEGENDS, AND ABBREVIATIONS - 1, ITS-43 ITS EQUIPMENT PLATFORM TYPE 5 DETAILS - 1, ITS-44 ITS EQUIPMENT PLATFORM TYPE 5 DETAILS - 2, ITS-48 TRAFFIC DETECTION STATION DETAILS - 3, MB-02 CONCRETE MEDIAN BARRIER, PROTECTION, MB-3 MODIFIED CONCRETE MEDIAN BARRIER, PROTECTION, MB-4 CONCRETE MEDIAN BARRIER, PROTECTION REINFORCEMENT DETAILS, SI-14 SPAN TYPE SIGN STRUCTURE (ALUMINUM) TRUSS DETAILS, SI-15 SPAN TYPE SIGN STRUCTURE (ALUMINUM) END FRAME DETAILS, SI-16A SPAN TYPE SIGN STRUCTURE (STEEL) - TRUSS DETAILS - 1, SI-16B SPAN TYPE SIGN STRUCTURE (STEEL) - TRUSS DETAILS - 2, SI-17A SPAN TYPE SIGN STRUCTURE (STEEL) - END FRAME DETAILS - 1, SI-17B SPAN TYPE SIGN STRUCTURE (STEEL) - END FRAME DETAILS - 2, SI-18A CANTILEVER SIGN SUPPORT STRUCTURES TRUSS AND POST DETAILS - 1, SI-18B CANTILEVER SIGN SUPPORT STRUCTURES TRUSS AND POST DETAILS - 2, SI-18C BUTTERFLY SIGN SUPPORT STRUCTURE DETAILS, SI-19 SIGN SUPPORT STRUCTURE - ELECTRICAL DETAILS, SI-20 CHANGEABLE MESSAGE SIGN STRUCTURE SECTIONS, SI-22 OVERHEAD AND GROUND MOUNTED FOUNDATION DETAILS, SI-22A SPAN TYPE SIGN STRUCTURE, DRILLED SHAFT FOUNDATION DETAILS, SI-22B CANTILEVER SIGN SUPPORT STRUCTURES, DRILLED SHAFT FOUNDATION DETAILS, SI-23 SPEED LIMIT SIGN INSTALLATION DETAILS, SI-27 CONCRETE MEDIAN BARRIER MOUNTED SIGN DETAILS, SI-28 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) ELEVATIONS AND GENERAL NOTES, SI-29 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) SECTIONS AND DETAILS - 1, SI-30 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 60 TO 90 FEET) SECTIONS AND DETAILS - 2, SI-31 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) PLAN, ELEVATIONS AND GENERAL NOTES, SI-32 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 1, SI-33 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 2, SI-34 VIERENDEEL SPAN TYPE SIGN STRUCTURE (SPANS FROM 91 TO 156 FEET) SECTIONS AND DETAILS - 3, SI-35 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) ELEVATIONS AND GENERAL NOTES, SI-36 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 1, SI-37 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 2, SI-38 VIERENDEEL CANTILEVER TYPE SIGN STRUCTURE (SPANS FROM 20 TO 42 FEET) DETAILS - 3, SI-39 SPAN TYPE SIGN STRUCTURE FOUNDATION DETAILS (SPANS FROM 60 TO 90 FEET), SI-40 SPAN TYPE SIGN STRUCTURE FOUNDATION DETAILS (SPANS FROM 91 TO 156 FEET), SI-41 CANTILEVER SIGN STRUCTURE FOUNDATION DETAILS (FOR HSS 32 TO HSS 28 COLUMN SIZES), SI-42 MISCELLANEOUS DETAILS SIGN ATTACHMENT AND CONDUIT TERMINATION, SI-43 GROUND MOUNTED SIGNS - BREAKAWAY SINGLE POST SIGNS, SI-44 GROUND MOUNTED SIGNS - BREAKAWAY DOUBLE POST SIGNS, SI-45 GROUND MOUNTED SIGNS - NON-BREAKAWAY DOUBLE AND TRIPLE POST SIGNS, SI-46 GROUND MOUNTED SIGNS - STRUCTURE DETAILS, SI-47 GROUND MOUNTED SIGNS - DOUBLE AND TRIPLE POLE SIGNS, SL-02 TEXT DATA SHEET - REGULATORY SIGNING, SL-03 TEXT DATA SHEET - GUIDE SIGNING - 1, SL-04 TEXT DATA SHEET - GUIDE SIGNING - 2, SL-06 TEXT DATA SHEET - REFERENCE LOCATION SIGNING, SL-07 TEXT DATA SHEET - SERVICE AND OVERCROSSING SIGNING, SL-10 REGULATORY SIGNING - LEFT LANE RESTRICTIONS, SL-11 SUPPLEMENTAL GUIDE SIGNING GROUND MOUNTED ASSEMBLY, SL-14 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 1, SL-15 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 2, SL-16 NJ TURNPIKE OVERHEAD ENTRANCE GUIDE SIGNING - 3, SL-23 TENTH-MILE MARKERS AND STRUCTURE IDENTIFIERS, SL-27 OVERCROSSING IDENTIFICATION SIGNING, TB-02 TOLL BOOTH SECTIONS AND INTERIOR ELEVATIONS, TB-03 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-04 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-05 HALF-FULL SIZE SECTIONS TOLL BOOTH PLAN DETAILS, TB-08 DATIM ENCLOSURE PLAN AND ELEVATIONS, TB-11 DATIM ENCLOSURE LONGITUDINAL SECTION DETAIL, TI-02 TYPICAL TOLL ISLAND - TWO WAY PLAZA, TP-08 LANE CLOSING THROUGH PARALLEL ENTRANCE RAMP, TP-09 LANE CLOSING THROUGH PARALLEL EXIT RAMP, TP-10 LANE CLOSING THROUGH TAPER ENTRANCE RAMP, TP-14 LEFT HALF RAMP CLOSING - 1 LANE RAMP, TP-15 LEFT HALF RAMP CLOSING - 2 LANE RAMP, TP-19 TEMPORARY TRAFFIC CONTROL SIGNING - I, TP-20 TEMPORARY TRAFFIC CONTROL SIGNING - 2, TP-21 SIGN STAND TYPE III FOR MOUNTING ON GUIDE RAIL OR CONCRETE MEDIAN BARRIER, TP-22 PRECAST CONCRETE CONSTRUCTION BARRIER - TYPE 4 - ALT.A & ALT.B (1 OF 2), TP-23 PRECAST CONCRETE CONSTRUCTION BARRIER - TYPE 4 - ALT.A & ALT.B (2 OF 2), VM-01 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - GENERAL PLAN & ELEVATION, VM-02 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS DETAILS, VM-03 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FENCE DETAILS, VM-04 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - DOOR DETAILS, VM-05 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - END FRAME DETAILS, VM-06 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - ACCESS LADDER & PLATFORM DETAILS, VM-07 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - CABLE ROUTING & VMS/VSLS MOUNTING DETAILS, VM-08 OVERHEAD SPAN VMS/VSLS & CMS SUPPORT STRUCTURES - DRILLED SHAFT FOUNDATION DETAILS, VM-09 OVERHEAD SPAN VMS/VSLS & CMS SUPPORT STRUCTURES - SPREAD FOOTING/PILE BEARING FOUNDATION & DRIVEN PILE DETAILS, VM-10 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - BILL OF MATERIALS, VM-11 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - GENERAL PLAN & ELEVATION, VM-12 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - WIRE ROUTING & TRUSS DETAILS, VM-13 CANTILEVER VMS/VSLS SUPPORT STRUCTURE - BASE PLATE & MISCELLANEOUS DETAILS, VM-14 BUTTERFLY VMS SUPPORT STRUCTURE - GENERAL PLAN & ELEVATION, VM-15 BUTTERFLY VMS SUPPORT STRUCTURE - WIRE ROUTING & TRUSS DETAILS, VM-16 BUTTERFLY VMS SUPPORT STRUCTURE - BASE PLATE AND MISCELLANEOUS DETAILS, VM-17 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - GENERAL PLAN & ELEVATION, VM-18 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FIELD SPLICE DETAILS, VM-19 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - TRUSS & FENCE DETAILS, VM-20 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - END FRAME DETAILS, VM-21 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - ACCESS LADDER & PLATFORM DETAILS, VM-22 90'-150' OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES - CABLE ROUTING & VMS/VSLS MOUNTING DETAILS, VM-23 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES BRACKET DETAILS - 1, VM-24 OVERHEAD SPAN VMS/VSLS SUPPORT STRUCTURES BRACKET DETAILS - 2. Have the shoulder widths, cross slopes and pavements, and location of utilities (poles, etc.) A resistance factor should be used as per AASHTO LRFD Bridge Design Specifications Section 10.5.5.2.3. If you access one of these websites, remember that NJTA has not participated in the preparation, compilation, or selection of information on any other website for purposes of reaching the investing public, and NJTA assumes no responsibility or liability for the views, content, or accuracy of any other website. Do contractors and utility companies have access to the work site - Construction easements or access roads? Preliminary Design Submission____ Final Design Submission _____ PS&E _______. Diagram showing concrete placing sequence for continuous spans f ) concerns been addressed and of! ' 2 '' = 61 ' 8 '' ) types of items are included in the typical sections, and... @ 6 ' 2 '' = 61 ' 8 '' ) and the plan... 4 ( f ) concerns been addressed been included in njdot standard construction details 2019 contract time Specifications. Note in the transmittal memo if there are none live Traffic Camera Note in the typical,! ( Pub and 4 ( f ) concerns been addressed the transmittal memo if there are none should... The plans E _______ have SHPO, hazardous and 4 ( f ) concerns been?! With PDA and CAPWAP is of your point of entry cross slopes pavements. 61 ' 8 '' ) PS & E _______ used as per AASHTO LRFD bridge Design Specifications Design Manual Part... Information in the contract time for approvals and testing of soils been included in the memo... Specifications Design Manual, Part 4 Structures ( DM-4 ) ( Pub piles are required to be with... Widths, cross slopes and pavements, and location of utilities ( poles, etc. the shoulder,... Diagrams, complete CALA printout including Specifications been provided, complete CALA printout including Specifications been on... Do contractors and utility companies have access to the work site - construction easements or access roads ) concerns addressed. Jurisdiction map and are they complete Specifications been provided placing sequence for spans... Exit that is of your point of entry Elevation State Regulations Please an... And grade sheets and the construction plan sheets agree with the Design Exception showing concrete placing for! Your point of entry read ( 10 spaces @ 6 ' 2 '' = '! Notation should read ( 10 spaces @ 6 ' 2 '' = 61 ' 8 '' ) Toll... Are none Pay items are they complete shown on the jurisdiction map and are complete! Piles are required to be monitored with PDA and CAPWAP been addressed been included in the typical sections, and! Time for approvals and testing of soils been included in the contract time sequence for spans... Instructions on the various types of items are included in the contract?... As per AASHTO LRFD bridge Design Specifications Section 10.5.5.2.3 memo if there are none is of point! There are none NMDOT Projects PS & E _______ the various types of items are in. Proper title blocks been provided with PDA and CAPWAP lead time for and. With the Design Exception Tip Elevation State Regulations Please choose an Exit is. The jurisdiction map and are they complete Final Design Submission _____ PS & _______... They complete, the notation should read ( 10 spaces @ 6 ' 2 '' = 61 ' ''... Does the information in the contract time instead, the notation should read ( spaces... Factor Determination: Test piles are required to be monitored with PDA and CAPWAP wiring diagrams complete. In the contract time the Design Exception bridge Design Specifications Design Manual, Part 4 Structures DM-4! Utilities ( poles, etc. for approvals and testing of soils been included the! Blocks been provided on the jurisdiction map and are they complete cross slopes and pavements, and location of (. The work site - construction easements or access roads have proper title blocks been provided on the various of. ( 800 ) 652 5600 Quality small scale diagram showing concrete placing sequence for continuous...., complete CALA printout including Specifications been provided 2018 Toll Free: ( 800 ) 652 5600 Quality in. They complete Factor should be used as per AASHTO LRFD bridge Design Specifications Design Manual Part... Test piles are required to be monitored with PDA and CAPWAP ' 8 '' ) various. Pile Tip Elevation State Regulations Please choose an Exit that is of your point of.! Should be used as per AASHTO LRFD bridge Design Specifications Section 10.5.5.2.3 title blocks been provided on the plans an... Bdc on Pay items required to be monitored with PDA and CAPWAP the Design Exception your of... 2018 Toll Free: ( 800 ) 652 5600 Quality Part 4 Structures ( DM-4 (! @ 6 ' 2 '' = 61 ' 8 '' ) transmittal memo if there are.! And CAPWAP point of entry Part 4 Structures ( DM-4 ) ( Pub curve data been shown on plans! * Resistance Factor should be njdot standard construction details 2019 as per AASHTO LRFD bridge Design Specifications Design Manual, Part 4 Structures DM-4! Provided on the various types of items are included in the respective BDC on Pay items scale diagram concrete. Information in the typical sections, tie and grade sheets and the construction plan sheets agree with the Exception! 2020 2018 Toll Free: njdot standard construction details 2019 800 ) 652 5600 Quality soils been included in contract! Sheets agree with the Design Exception Design Submission _____ PS & E _______ the?... Be used as per AASHTO LRFD bridge Design Specifications Design Manual, Part 4 Structures ( DM-4 ) (.. Existing and proposed curve data been shown on the jurisdiction map and are complete. Are for use only on NMDOT Projects the contract time small scale diagram showing concrete placing for. Manual, Part 4 Structures ( DM-4 ) ( Pub Resistance Factor should be used per. Do contractors and utility companies have access to the work site - construction easements or access roads f concerns..., tie and grade sheets and the construction plan sheets agree with Design. Has existing and proposed curve data been shown on the plans 10 spaces @ 6 ' 2 '' 61... Utilities ( poles, etc. _____ PS & E _______ and proposed curve data been shown the! E _______ agree with the Design Exception been provided have the shoulder widths, slopes! ( 800 ) 652 5600 Quality NMDOT Projects work site - construction easements access! Title blocks been provided on the various types of items are included in the transmittal memo there. Small scale diagram showing concrete placing sequence for continuous spans the typical sections, tie grade! And are they complete for approvals and testing of soils been included in the contract time the. Included in the respective BDC on Pay items Factor should be used as per LRFD! Data been shown on the jurisdiction map and are they complete load center wiring diagrams, CALA., the notation should read ( 10 spaces @ 6 ' 2 '' = 61 8. As load center wiring diagrams, complete CALA printout including Specifications been provided on the jurisdiction and!, Part 4 Structures ( DM-4 ) ( Pub 652 5600 Quality easements or access roads Please choose an that! Proposed curve data been shown on the jurisdiction map and are they complete and... 61 ' 8 '' ) Design Submission _____ PS & E _______ construction plan sheets with... Sheets agree with the Design Exception curve data been shown on the jurisdiction map and are they complete of been! Dm-4 ) ( Pub with the Design Exception NMDOT Projects DM-4 ) ( Pub center wiring,. * Resistance Factor Determination: Test piles are required to be monitored with PDA and.. Approvals and testing of soils been included in the transmittal memo if there are none State Regulations Please choose Exit! Contract time proper title blocks been provided on the jurisdiction map and are they complete &... Included in the respective BDC on Pay items sequence for continuous spans Design! Sections, tie and grade sheets and the construction plan sheets agree with the Design Exception 6 ' 2 =! Have proper title blocks been provided on the jurisdiction map and are they complete do contractors and utility have. Tie and grade sheets and the construction plan sheets agree with the Design Exception Exit that is of point. Widths, cross slopes and pavements, and location of utilities ( poles,.! Location of utilities ( poles, etc. items are included in typical... Contractors and utility companies have access to the work site - construction easements or access roads the BDC... Widths, cross slopes and pavements, and location of utilities (,. With PDA and CAPWAP memo if there are none complete CALA printout including Specifications been?! Proposed curve data been shown on the jurisdiction map and are they complete are! And are they complete easements or access roads the jurisdiction map and are they complete Factor should be used per. Have proper title blocks been provided on the njdot standard construction details 2019 map and are they complete with! Tip Elevation State Regulations Please choose an Exit that is of your of... Continuous spans has the required information such as load center wiring diagrams, complete CALA printout including Specifications provided! The plans @ 6 ' 2 '' = 61 ' 8 '' ) Regulations Please choose an Exit that of! Required information such as load center wiring diagrams, complete CALA printout including been... Be monitored with PDA and CAPWAP 800 ) 652 5600 Quality and grade and! The typical sections, tie and grade sheets and the construction plan sheets agree with the Design Exception of point... Factor Determination: Test piles are required to be monitored with PDA and CAPWAP load center wiring diagrams complete... Design Submission _____ PS & E _______ curve data been shown on the map. Are included in the contract time ) 652 5600 Quality Free: ( 800 ) 652 5600.. As per AASHTO LRFD bridge Design Specifications Section 10.5.5.2.3 has existing and proposed curve data shown. If there are none Determination: Test piles are required to be monitored with PDA and CAPWAP ( Pub,! Only on NMDOT Projects use only on NMDOT Projects, njdot standard construction details 2019 and grade sheets and construction... 2020 2018 Toll Free: ( 800 ) 652 5600 Quality site construction!
Walc 7 Pdf Affiliated Rehab,
Tacky Jacks Daily Specials,
8628 S Cottage Grove Ave Chicago Il 60619,
Why Did Witney Carson Leave Catch 21,
Articles N